Membrane installation apply grace ice water shield underlayment in fair weather when the air roof deck and membrane are at temperatures of 40 f 5 c or higher.
Hip roof ice and water shield installation.
One person can install long lengths of ice and water shield to the roof however it is easier for two people to install especially with some new installation tricks.
Ice and water shield the whole roof.
Of sheet is strips of the membrane can also be used as stripping.
Ice water shield is a thick sticky back underlayment also known as felt paper that will adhere to your roof deck and prevent water from seeping into your home if it gets under your shingles.
If you see ice and water shield being installed you might think it is felt paper.
Install the ice and water shield membrane so that it laps securely over and bonds to the surface of the drip edge.
Ice and water protector needs to be installed directly onto the roof deck after you have placed the drip edge at the eave.
Cut the membrane into 10 15 ft 3 5 m lengths and reroll loosely.
If replacing your roof and installing a new skylight at the same time ask your roofer to have an ice and water shield installed with the roof underlayment to anticipate ice dams.
Install waterguard rain ice first in roof valleys see instructions below and as a flashing membrane at roof to wall transitions around vents curbs skylights and other roof penetrations.
If an ice dam occurs on your roof and water backs up under the shingles it will seep down into your home through the nail holes holding the shingles on and into your attic.
What is ice water shield.
The arguement that oh i would hate to be the next guy having to remove the ice and water shield couldn t you just remove the shingles leave the ice and water down and then put new ice and water on top of the old.
Felt paper or tar paper is also a rolled material you see roofers nailing down under shingles.
Then apply along the eaves.
Once there it will saturate plywood insulation and drywall which will lead to interior home.
Once in place follow by flashing the rakes.
Remember that in high.
The drip edge will be installed over the ice and water protector and other underlayments at roof rake edges you should install ice and water protector before other underlayments including roof felt.