Push the drip edge a bit so that it passes under the shingle and appears from its other side.
How do i install a drip edge on a roof.
Make sure the outer edge extends over the gutter.
Secure the drip edge with roofing cement.
If it doesn t pull the drip edge out slightly from under the shingles.
Install sheet metal drip cap over the lower rim.
Slowly lift a shingle that is closest to the apex of the roof.
How to install a drip edge.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Using a utility knife cut back the front end of the drip edge.
Build the lower rim of roof extended away from the fascia.
You may need to nail through the starter strip into the drip edge.
Be sure to tuck the drip edge under the starter strip and felt paper.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
The common practice of installing drip edge tightly to the fascia creates a path for water to cling to the fascia and run down it wearing the face of the fascia and shortening its lifespan.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
4 deep nail the drip edge to the sheathing every 16.
By installing corrugated metal roof drip edge it will be easier for that mass to move down or be removed.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and nailing or screwing it down.
Use 1 inch galvanized roofing nails or 3 4 inch exterior screws.
Place a nail at one end then the other.
Gently slide the flatter side of the drip edge under the eave.
If you do make sure the nails will not align with any shingle seams or cutouts above.
Please like and subscribe for more instructional videos.
In today s video we go over the basic techniques to installing drip edge and rake edge on your roof.
Overlap two pieces of flashing that meet end to end by at least 1 inch.
The extension should be at least inch for it to work.
Slide the corner tight to the fascia.