Shake siding design.
How do you dispose of cedar shake siding.
While cedar stands up to the elements fairly well on its own putting a seal or a coat of paint on it can enhance the color and protect the wood from inclement weather.
Fiber cement shingles and shakes are available in straight and irregular edges as well as individual shakes allowing you greater flexibility in designing your exterior.
Cedar siding maintenance must be a regular task so that you can avoid permanent damage to your home s exterior.
Move it up and tack it in place again.
How do i recycle wood.
Apply it with a pump sprayerlet it sit for about 15 minutes before rinsing it off with with a garden hose.
The cedar bureau recommends using a solution of 1 part bleach to 3 parts water.
Left untreated cedar shakes individual planks of one of several varieties of cedar will discolor and begin to soften with a possibility of rot after about five years depending on your climate.
The siding may also contain asbestos if it is old with a wood grain texture to resemble cedar.
Cover about a 4 by 8 foot section with the liquid and let it sit on the siding for about 15 minutes.
The wood s structural integrity will remain unless the wood is exposed to excessive moisture which can cause curling cracking and wood rot.
Americans produced 15 84 million tons of wood waste and 33 20 million tons of yard trimmings in 2009 see references 4 page 7.
Left unstained cedar s red hue will fade to gray within about a year.
Move along and chalk line every five or six courses being careful not to damage the underlying roof shingles.
While most people associate shakes with cedar they can actually be made of a few different materials including durable and low maintenance fiber cement.
These shingles are generally 12 by 24 inches and the bottom tends to have a wave like pattern though that is not always the case.
You have several options for covering cedar siding including stain a clear treatment or paint.
Mix the oxygen bleach in a ratio of 2 cups of powdered granules to 1 gallon of water or based on the product and manufacturer s instructions on the label.
Tack it in place being careful not to damage the underlying roof shingles then lay out and nail a course.
Lay out and nail into shingles and repeat five to six courses.
If your siding fits either of these descriptions you should consider having it tested.
Whether you re building demolishing or.
Be sure to keep the hose pointed downward to avoid forcing water up behind the shingles.